Engineered fill platform

Geotechnical

Ground
Engineered fill over natural
Method
Density testing at a stated frequency
Scope
Fill specification and compaction testing
Outcome
Platform with a signed record

Filled ground is only as good as its record. A platform built without testing is a platform nobody can sign for, and that becomes a problem at consent rather than at the time it would have been cheap to fix.

This platform was built to a written specification rather than to judgement on the day: material type, layer thickness, moisture and a target density. The results are the deliverable, alongside the plan showing where each test was taken.

With that record in hand the foundation above could be designed on measured ground conditions instead of on an allowance, which is usually where the cost saving actually turns up.